Construction of hydroelectric power plants VVE Ltd.

In industrial estate (former ZŤS), a new hall of company Construction of hydroelectric power plants – VVE is being built. Overhead travelling cranes with the lift capacity of 180 t will be an interesting element of the hall. We take part in the realization of this construction and we provide construction supervision for the investor. The subject of production will be metal production of steel constructions, piping products, tanks, precision machining of large components for installation in energy buildings.

View Details 10.april 2015

Apartment house @lph@ Pezinok

Thanks to its interesting architecture, resolved underground parking and two impressive duplex apartments, the apartment house @lph@, which is going to be built in Pezinok, will be attractive for those who are interested in lucrative housing close to Bratislava. We are glad we took part in this project as a supplier of implementation project focused on statics.

View Details 15.march 2015

Production plant CCN GROUP Slovakia Ltd., Beluša

In less than 5 months, quite a large plant with investment more than 6.5 million € was built. Company CCN GROUP Slovakia Ltd. is a part of an international group CCN GROUP, which is important European supplier of precision parts and sets for turbofan and hydraulic systems for cars, which improve engine power. More than 500 people will be employed in the plant after its opening planned for June 2015.

View Details 20.december 2014

Extension of assembly area HF NaJUS Inc., Dubnica n/V

The building with purpose to extend the production up to 15% was built in industrial estate in Dubnica nad Váhom (former ZŤS). The halls will be used for production and assembly of machines and appliances according to customer’s needs. The part of area will be used for storage intended for distribution. We provided construction supervision for the investor.

View Details 15.august 2014

City Arena Trnava

We took part in the project which will significantly improve football infrastructure and sporting environment in Trnava. In addition to underground parking lots, a shopping centre will be built there and together with the stadium, they will create one unit. General contractor STRABAG approached us with the offer to work out works documentation of manufacturing prefabricated elements of the skeleton structure for particular part of the building.

View Details 10.july 2014