Drainage system of construction hall LEONI Slovakia Ltd.

For the needs of foreign investor we provided:

  • Project documentation and complex engineering by dealing with planning permission as a general contractor
  • Management of changes and additions to project documentation and construction activity
  • Administration, distribution and archiving of documents during the realization of the construction
  • Management of the construction process and the schedule of construction
  • Management and quality control
  • Management and cost control
  • Introduction of the system for final delivery of the building, technical support with taking the building over and final approval of construction
  • Ilava
  • 2014
  • 17 880 m2

Gallery: Drainage system of construction hall LEONI Slovakia Ltd.

Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd. Drainage system of construction hall LEONI Slovakia Ltd.